Preliminary study model
After the preliminary analysis of the nature of the site, I found that the most immediate problem to be solved in the project was how to create a platform connecting two different heights, and how to use the original facilities of the farmland below, such as the greenhouse wooden frame, which naturally planned a road, and try to use the extension of these roads to create the layout space of the tea room, and make a model to determine the prototype of the tea house.
Comments
Post a Comment